6 edition of Space telescope cost, schedule, and performance found in the catalog.

Space telescope cost, schedule, and performance

hearings before the Subcommittee on Space Science and Applications of the Committee on Science and Technology, U.S. House of Representatives, Ninety-eighth Congress, first session, June 14, 16, 1983.

by United States. Congress. House. Committee on Science and Technology. Subcommittee on Space Science and Applications.

  • 28 Want to read
  • 24 Currently reading

Published by U.S. G.P.O. in Washington .
Written in English

    Places:
  • United States.
    • Subjects:
    • Hubble Space Telescope (Spacecraft),
    • Astronautics and state -- United States

    • Classifications
      LC ClassificationsKF27 .S3995 1983
      The Physical Object
      Paginationiii, 288 p. :
      Number of Pages288
      ID Numbers
      Open LibraryOL2818448M
      LC Control Number83603387

      The Agency completed a replan of the JWST cost and schedule baseline on Septem , and sent the revised cost and schedule requirements, along with the analysis of alternatives, to Congress on Octo , in a breach report pursuant to Section of the NASA Authorization Act of (P.L. ): Baselines and Cost Controls.   The Hubble Space Telescope, designed to cost $ million, finally tallied out at $ billion. Only after launch did researchers find it had reached orbit with a faulty mirror that needed correcting.

        Components of the James Webb Space Telescope at NASA’s Goddard Space Flight Center in Greenbelt, Md. The agency announced Wednesday that it will not be ready for launch until   A House hearing on the reasons for cost and schedule problems with major NASA programs pointed blame at a wide variety of sources, from the tools used to track programs to the agency's mindset to Author: Jeff Foust.

      The observatory will now fly no earlier than ; until last fall, it was on the books for a launch. The telescope's overall cost is now expected to reach nearly $10 billion.   Reports on the Status of NASA's James Webb Space Telescope and Commercial Astronaut Crew Program for Space Station Transport - Continued Problems, Challenges, and Schedule Strain with Cost Implications. The e-book format makes a great reference work and educational tool. There is no other reference book that is as convenient.


Share this book
You might also like
Microgravity Fluid Management Symposium

Microgravity Fluid Management Symposium

new racism

new racism

guide to improving the national education data system

guide to improving the national education data system

Haunted Gym

Haunted Gym

Mapping the work of international volunteer agencies operating in Vanuatu.

Mapping the work of international volunteer agencies operating in Vanuatu.

Female occupations

Female occupations

Airplane lofting

Airplane lofting

Lilio De Medicina/Includes Microfiches (Spanish Series, No. 31)

Lilio De Medicina/Includes Microfiches (Spanish Series, No. 31)

Spanish military dictionary: English-Spanish; Spanish-English.

Spanish military dictionary: English-Spanish; Spanish-English.

Subsidy and subsidy-effect programs of the U.S. Government: materials prepared for the Joint Economic Committee, Congress of the United States.

Subsidy and subsidy-effect programs of the U.S. Government: materials prepared for the Joint Economic Committee, Congress of the United States.

Green Lantern

Green Lantern

Democracy and the arts

Democracy and the arts

Root-bound, and other sketches

Root-bound, and other sketches

Space telescope cost, schedule, and performance by United States. Congress. House. Committee on Science and Technology. Subcommittee on Space Science and Applications. Download PDF EPUB FB2

Additional Physical Format: Online version: Space telescope cost, schedule, and performance review, Washington: U.S.G.P.O., (OCoLC) On May 22the Subcommittee held oversight hearings to review the cost, schedule, and performance of the Space Telescope program.

These hearings coincided with a particularly crucial time in the Space Telescope program. The manufacturing phase was drawing to a close and the assembly and integration phase was scheduled to begin in November Space telescope cost, schedule, and performance: hearings before the Subcommittee on Space Science and Applications of the Committee on Science and Technology, U.S.

House of Representatives, Ninety-eighth Congress, first session, J 16, by United States. Congress. House. Committee on Science and :   Posted: pm ET | Last Updated: pm ET | Find out about GAO's somber assessment of NASA's cost and schedule performance on its major programs -- those with a life-cycle cost of more than $ million.

It concludes the situation continues to deteriorate. The news comes just as NASA is trying to win support for its Artemis. JWST and SLS drive up cost and schedule growth on NASA programs by Jeff Foust — June 3, The spacecraft element of NASA's James Webb Space Telescope being prepared for thermal vacuum testing.

Full text of "Space telescope cost, schedule, and performance: hearings before the Subcommittee on Space Science and Applications of the Committee on Science and Technology, U.S. House of Representatives, Ninety-eighth Congress. Space telescope cost, schedule, and performance review, report / Committee on Science and Technology.

Subcommittee on Space Science and Applications. Abstract. Item A-1, A-2 (microfiche)"Serial JJ.""October "Distributed to some depository libraries in head of title: Committee of access. Page 2 GAO James Webb Space Telescope. sustained key improvements to performance and oversight undertaken since To assess the extent to which the project is executing within its revised cost and schedule targets, we examined the status of the project’s schedule, cost, and technical risks.

Specifically, we analyzed monthly. NASA’s Historic Challenges to Meeting Cost, Schedule, and Performance Goals NASAs storied history evidences a unique agency with spectacular accomplishments.

For example, since its launch in the Hubble Space Telescope (Hubble) has helped scientists determine the age of the universe, identify quasars, and prove the existence of dark Size: KB.

For JWST, the Hubble Space Telescope's successor, these areas include cost, schedule, technical, and business management and are established in the contract's performance evaluation plans. Get this from a library. Space telescope cost, schedule, and performance: hearings before the Subcommittee on Space Science and Applications of the Committee on Science and Technology, U.S.

House of Representatives, Ninety-eighth Congress, first session, J 16, [United States. Congress. House. Committee on Science and Technology.

The latest upgrades on the telescope cost about $ million. After the current round of repairs, the telescope is expected to function until While this may seem like a lot, it is actually cheaper than building a new telescope.

Whatever the costs of the Hubble Space Telescope, its contribution to astronomy and science will endure. The James Webb Space Telescope (JWST) project is generally executing to its September revised cost and schedule baseline; however, several challenges remain that could affect continued progress.

The National Aeronautics and Space Administration (NASA) has requested funding that is in line with the rebaseline and the project is maintaining 14 months of schedule. SLS and JWST are identified as having deteriorating cost and schedule performance due to risky decisions involving technology.

GAO found the commercial crew contractors continue to have. WASHINGTON — As NASA commits to performing another cost and schedule estimate for the James Webb Space Telescope, the chairman of an independent review board said he’s concerned about its.

A variety of risks and benefits are associated with on-orbit servicing of the Hubble Space Telescope (HST). There are risks to human safety, as well as several types of programmatic risks, including not meeting cost requirements, not meeting schedule.

James Webb Space Telescope Schedule Reserve Remaining in and a. Inthe ISIM and OTE elements were in separate integration efforts. Inthey were Our approach included an examination of the schedule, technical, and cost performance of the project since our last report in December —.

The James Webb Space Telescope (sometimes called Webb or JWST) is a large infrared telescope with a meter primary mirror. Webb will be the premier observatory of the next decade, serving thousands of astronomers worldwide.

Webb’s launch delayed to at an extra cost of nearly $1 billion detailing Webb’s new schedule and cost estimates. the James Webb Space Telescope will be worth the cost of. launch date with adequate cost and schedule margin, consistent with the ICRP recommendation. PROJECT PURPOSE JWST is a large, deployable, space-based infrared astronomical observatory.

The mission is the scientific and technological successor to the Hubble Space Telescope, extending Hubble's discoveries by looking into the infrared spectrum. The telescope for WFIRST has successfully passed its preliminary design review, a major milestone for the mission.

This means the telescope has met the performance, schedule, and budget Author: Ashley Balzer. Now estimated to cost $ billion, the project's costs have increased by 95 percent and its launch date has been delayed by over years since its cost and schedule baselines were established.James Webb Space Telescope (JWST) Program Status and Replan Astrophysics Subcommittee Julyfor conducting in- depth analysis and projections of monthly JWST Project cost and schedule performance.

DONE. Improve communications between the JWST Project and both GSFC management and NASA Space Telescope. File Size: 2MB.